Miniatur Wunderland

Opening August 2001 2001
Layout Size 1,694m2
Sections 12
Track length 16,491 m
Trains approx. 1,231
Wagons > über 12,000
Longest train 14,51 m
Signals 1,403
Switches 3,627
Computer 59
LEDs ca. 521,500
Buildings 5,278
Figures 292,110
Cars 11,080
Trees 157,000
Working Hours more than 1,200,000
Employees over 400
Construction Cost 45,000,000 €

 

The Future of Miniatur Wunderlandes in Numbers

Monaco

Opening 25.04.2024
Construction Period Mai 2018 – April 2024
Layout Size 40 m2
Figures 7.000
LEDs 20.000
Trees 4.000
Trains 40
Push Buttons 8
Cars 300
Yachts 175
Formula 1 cars 60
Programming code 100,000 lines

Rain forest

Opening End of 2025
Layout Size 107 m2

The Andes & Atacama Desert

Opening End of 2025
Layout Size 38 m2


Central America & The Caribbean

Opening End of 2027
Layout Size 67 m2
Construction time approx. 90,000 hours
Track length 1,100 meters
Buildings approx. 300
Figures approx. 50,000
LEDs approx. 40,000
Trees approx. 15,000
Trains approx. 180

Asia (Part 1)

Opening End of 2028
Layout Size approx.150 m2

The future from 2028

Wunderland has never been in need of ideas. But whether we build other parts of Asia or Africa, England, perhaps the Netherlands or something completely different, we don’t want to decide yet. One thing is for sure: The real world offers so much inspiration and if things go our way, we will never stop building.